5.5.1 Power ON
1.Inspect the DC switch in PV module distribution box, use a multimeter
to measure if the input is within rated values (125~500V).
2.Inspect the AC switch on the distribution panel, make sure the utility grid's
voltage and frequency is within typical range.
3.Turn on DC switch and AC switch.
4.After transmission has begun, the inverter will display a boot screen. At
this time the GSI will verify the utility grid's AC voltage and frequency. When
this process is complete, the inverter will officially start generating power
which is then fed back into thte utility grid.
Caution :
When designing the sys tem, the user must be
Caution :
If the local electrical code requires an additional
mi n d fu l o f the o p en ci r cu it vo lta g e whe n t he
ambient temperature is at its lowest; This voltage
must not be greater than inverter ratings.
residual current breaker (RCD), the user should
choose one with rated breaking leakage current
above 100mA.
5.5.2 Power OFF
1.Switch OFF the circuit break in the PV module distribution box and the
graphics on the GSI display screen will go out.
will be disconnected from utility grid.
2.Switch OFF the circuit break on the AC distribution panel and the GSI
3.Check if the display screen has no graphics, the GSI is now OFF.
1.Remove the side and mounting bracket screw.
2.Use the handles on the side of the GSI and remove it from the wall mounting
bracket.
5.6.1 Disassembling Procedure
5.6 Disassembly
Risk of electric shock, Energy storage
timed discharge. 1 minutes