PV Powered 5200 Spezifikationen Seite 44

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 96
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 43
43
DOCR 070366-B
Stranded copper wire should be checked for all strands inside the
terminal opening.
If a neutral wire connection is required for the connection grid to
make sure the neutral wire is securely connected to the neutral
terminal. Loose neutral wire connection will result in incorrect grid
voltage detection.
NOTICE!
AVIS!
Connect the Neutral wire to the “N” screw terminal (B), and using a torque wrench,
tighten the screw terminal to to 10.5 in-lbs (1.2 Nm) of torque.
Connect L1 wire to the “L1” terminal (D), and using a torque wrench, tighten the screw termi-
nal to to 10.5 in-lbs (1.2 Nm) of torque.
Connect L2 wire to the “L2” terminal (C), and using a torque wrench, tighten the screw termi-
nal to to 10.5 in-lbs (1.2 Nm) of torque.
4.8.7 Inverter RS-485 communication connections
WARNING!
AVERTISSEMENT!
Read all of these instructions, cautions, and warnings for the Solec-
tria PVI inverter and associated PV array documentation rst.
Interface connection RS-485
The Solectria PVI inverters offer an RS-485 communication interface which can address up to 16
daisy chained inverters. For optimal performance, the last inverter in the chain must always have
the termination jumper placed in the “on” position.
Figure 36: Inverter RS-485 system diagram
J1=RS-485 port 1
J2=RS-485 port 2
NOTE: up to 1000‘ total length of RS-485
cables possible depending on site specics.
NOTICE!
AVIS!
Seitenansicht 43
1 2 ... 39 40 41 42 43 44 45 46 47 48 49 ... 95 96

Kommentare zu diesen Handbüchern

Keine Kommentare